From mazz@ipac.caltech.eduMon Feb 3 16:17:58 1997 Date: Wed, 29 Jan 1997 11:43:01 -0800 (PST) From: Joe MazzarellaTo: ISIS -- Nian-Ming Chiu , Roc Cutri , Tracey Evans , John Good , Carol Lonsdale , Joe Mazzarella Cc: Tom Chester Subject: 14-Jan-97 2MASS DBWG (ISISWG) Meeting Minutes Reminder: Meeting today (postponed from Tue.) in SCR at 13:00. *************************************************************************** 14-Jan-97 2MASS DBWG Meeting Minutes ATTENDED: Nian-Ming Chiu, Roc Cutri, Tracy Evans, John Good, Carol Lonsdale, Joe Mazz COMPLETED ACTIONS: Nian: o (Re)configure Informix data/work space for non-2MASS db's: DBs are now: tmass, iras, other o Work with Tracy and Joe to load IRAS FSC and 2MASS SIM into Informix. Tracy: o Load 2MASS SIM into Informix (w/ Nian & John) John: o Got 6 more copies of the Informix docs for us. o Help Tracy complete draft column definitions (SIS). o Investigate how missing data (NULL) and scaled ints are treated in detail by Informix/Illustra. (But details of how NULL is internally represented is still pending.) o Talked to RAID guys: -$346k for 600GB(?) is not enough for the long term. -It was decided to put off a RAID decision. -RAID-dependent goals that will have to wait: shared-disk db opimization; repartitioning to increase query speed; full-resolution on-line image archive; etc. Joe: o Load IRAS FSC into Informix (w/ Nian) PRIORITY ONGOING ACTIONS: (Long-term ongoing actions omitted here. See task schedule on our Web.) Tracy: o Working on SIS's for DBMAN & WSDB field definitions (SIS) o Help Joe learn about 2MASS SIS's requirded for ISIS: DNMAN, bookkeeping, scans, etc. John: o Infrastructure (& User System w/ Joe) design docs. o Prototype/build infrastructure (& User System w/ Joe) code. Joe: o User System (& Infrastructure w/ John) design docs. o Prototype/build User System (& Infrastructure w/ John) code. John: o Work w/ Rosanne & Informix to finally schedule an Informix/Illustra (Universal Server?) class for us. Carol: o Sign off on Joe's revisions to the Requirements doc. o Discuss hardware budget with Tom & Roc. Joe: o Make 1st contact w/ Alex Szalay and Evaluate SDSS interface. o Complete Xcatscan+IRAS sections and revisions of Requirements doc in preparation for wider ISIS meeting. o Hook SIS's to internal 2MASS Web (w/ Tracy & Roc). Roc: o Coninuing to refine output fields for DNMAN (w/ Tracy et al.) GENERAL DISCUSSION: All: o ISIS is now the working system name. Roc: o USNO-A: -has no star/galaxy classification; next version (B) will. -has ~5e8 objects and takes up ~6 GB. Do we have the disk space to load it into Informix? Tracy: o NOTE: Draft SIS's are in /2massc/doc/design/sis/dbm* Nian: o Report from loading FSC: -No tinyint (0-255) in Informix as in Sybase. We'll use smallint (2 bytes). This effects ~10 FSC fields. -Timings for FSC (173,044 objects, 76 fields): ~10 min. to export from Sybase ~10 min. to import to Informix ~20 min. to index in Informix ==> Informix can index ~10k objects/minute (for FSC-like tables) NEW OR HIGH PRIORITY ACTIONS (See also ONGOING above and in Web Task List): Joe: o Complete and review Sci. Req. doc w/ Carol o Start contacts (w/ John) with IPAC mission managers in preparation for general ISIS 'kick-off' meeting. o Make an "RTB" for Sybase->Informix db migration (FSC to start) John: o Summarize DB-Access usage modes (e.g., shell scripts) for us. o Call Cassini Project and get their story on the raid disk. o Help (w/ Nian) Tim get started with Informix for WIRE. o *** See though scheduling of Informix classes (w/ Rosanne) Nian: o Make new partition for general workspaces: 1) for 2MASS/ISIS developers 2) for real-time data staging during user queries (ISIS) 3) consider disk purging time-scales, etc. o Help (w/ John) Tim get started with Informix for WIRE. Tracy: o Add colors to DNMAN SIS: J-H,B-R,B-J,H-K,R-K,R-J,J-K,B-K (refine list?) o Identify "the best" mag for extended objects (w/ Roc) Roc: o Get Sci. Team to pick a "best" (default) mag to represent extended objects (of course, all will still be maintained)